Revamping of DOW chemical plant in Estarreja (Portugal)

Division:

Assembly

Sector:

Petrochemical

Description:

Main activities:

-Piping (40000)

-Demolition, resiting, assembly and hydraulic pressure test of equipment

-Piping demolition (200 isos)

-Insulation

Duration:

8 months + 2 months of shutdown

Ammount:

6.000.000 €

Hours Worker:

120.000