Desulphurisation of thermal power plant in Mejillones, Chile

Division:

Engineering and Manufacturing

Sector:

Energy

Client:

Cobra Plantas Industriales

Description:

Engineering and manufacture of system for storage, crushing and dosing of limestone to eliminate sulphur from the fluid bed in two boilers.
Storage area with stacker.
4 mills of 700 kW each.